Don’t miss out on Jim's latest articles, here is a list of them.
In electricity planning, everything is geared to peak demand. About 15% of the total generation capacity in Ontario is required because of peak demand for 50 out of the 8,760 hours a year. In other words: Billions of dollars of capital cost are spent in developing the capacity to prepare for and supply demand which occurs only 0.57% of the time.
Read more: http://bit.ly/6uSkdw
Tesla’s market capitalization (value) is greater than the combined value of General Motors, Ford, Fiat Chrysler, Toyota, Honda, Volkswagen, Nissan, Daimler (Mercedes Benz), Hyundai, Kia, BMW and Renault as of January 2022.
Continue readingLorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.
Block quote
Ordered list
Unordered list
Bold text
Emphasis
Superscript
Subscript
#1 International Best Selling Author, Management Consultant, Keynote Speaker, and Strategic Planning Facilitator
Boost the bottom line of your business with expert advice from CURRENT Organization, a professional innovation consultant based business in Toronto, Ontario.